Order Windows in August for Winter Installation in Luxembourg

4 min de lecture Samuel Thiret — Founder of Satyvo SA

At a glance

  • Ordering new windows in August ensures installation before winter, avoiding 8-12 week delays in high season.
  • Window replacement is eligible for the Klimabonus Wunnen 2026 grant: 70 EUR per m² of window (outer dimensions), provided the glass reaches Ug ≤ 0.6 W/m²K.
  • Early ordering gives better prices and a wider choice of materials and finishes.
  • Pre-winter installation immediately improves thermal and acoustic insulation, reducing heating bills.
  • The 3% reduced VAT applies to renovation work in a main residence built at least 10 years before the work starts, making the project cost-effective.
Table of contents (8)
  1. 1. The Right Time to Order Your Window Frames
  2. 2. Window Replacement: A Profitable Investment
  3. 3. Manufacturing and Installation Times: Why August Is Ideal
  4. 4. How to Benefit from Financial Aids in 2026
  5. 5. Choosing the Right Window Frame Type for Your Home
  6. 6. Illustrative Case: A Typical Project in Luxembourg
  7. 7. Mistakes to Avoid When Ordering
  8. 8. Conclusion: Act Now

Key information

Klimabonus Wunnen grant for window replacement 70 EUR per m² of window, outer dimensions (80 EUR with the transitional increase); glass Ug ≤ 0.6 W/m²K
Grant cap for windows Capped at 60% of actual costs excluding VAT; the grant is paid per m² of window (outer dimensions)
Average manufacturing and delivery time for a window frame 8-12 weeks in high season (September to November)
Average time in low season (ordering in August) 4-6 weeks
Reduced VAT for renovation (main residence, home at least 10 years old) 3% (instead of 17%)
Grant for roof insulation (at least 20 cm of insulation at λ 0.035) a rate per square metre insulated, from 35 to 115 EUR/m² depending on the insulant and the performance standard reached (up to 140 EUR with the transitional increase)
Grant for photovoltaic installation (10 kWp) 8,250 EUR (a flat 10,000 EUR from 15 kWp)
Grant for home battery Up to 2,250 EUR (reached from 9 kWh of usable capacity)

The Right Time to Order Your Window Frames

In Luxembourg, replacing windows is a major investment to improve your home's energy efficiency. However, most homeowners wait until autumn to start, creating high demand for manufacturers. Result: delivery times lengthen and installations are postponed until late winter. That's why ordering your window frames in August is a winning strategy to guarantee installation before the first cold snaps.

By ordering now, you avoid the high-season rush and ensure your new windows are installed before November, just in time for winter. Additionally, companies often have more availability in August, which can translate into more competitive prices and a wider selection of materials and colors.

Window Replacement: A Profitable Investment

Replacing your windows isn't just about comfort; it's also a way to significantly reduce your heating bills. Old windows are responsible for 10-15% of a home's heat loss. By opting for double or triple glazing, you improve thermal and acoustic insulation, increasing your property's value.

In Luxembourg, the Klimabonus Wunnen 2026 program (which replaced PRIMe House in January 2022) offers financial aid for window replacement: you can receive 70 EUR per m² of window (measured on its outer dimensions, 80 EUR with the transitional increase), provided the glass reaches Ug ≤ 0.6 W/m²K. This grant is combinable with the reduced 3% VAT for renovation work in a main residence built at least 10 years before the work starts. With these aids, the net cost of your new windows can be significantly reduced.

Manufacturing and Installation Times: Why August Is Ideal

Manufacturing a custom window frame typically takes 4-6 weeks in the low season, but this can stretch to 8-12 weeks between September and November when demand peaks. By ordering in August, you ensure manufacturing is completed for installation in September or early October, well before the harsh cold.

  • Better artisan availability: In August, companies have fewer projects, so they can dedicate more time to you.
  • Faster installation: With reduced lead times, you can schedule installation at a convenient date without stress.
  • Avoid bad weather conditions: By installing before winter, you avoid rain, wind, or cold that can complicate the work.

How to Benefit from Financial Aids in 2026

To benefit from the Klimabonus Wunnen, you must submit your application before starting work. By ordering your frames in August, you have time to gather quotes, submit your file, and get financing approval before the project begins. The procedure is done online via the Klima-Agence website or the guichet.public.lu portal.

Here are the key steps:

  • Check your eligibility on klima-agence.lu.
  • Get a quote from a certified company.
  • Submit your grant application before work begins.
  • After installation, submit invoices for reimbursement.

Remember, the window grant is 70 EUR/m² of window, but other aids exist: roof insulation is paid at a rate per square metre insulated, from 35 to 115 EUR/m² depending on the insulant and the performance standard reached (up to 140 EUR with the transitional increase), up to 10,000 EUR for photovoltaic panels (8,250 EUR for 10 kWp, a flat 10,000 EUR from 15 kWp; no prior approval is needed, but you must give up the regulated feed-in tariff), and up to 2,250 EUR for a home battery (reached from 9 kWh of usable capacity).

Choosing the Right Window Frame Type for Your Home

The choice of materials is crucial for durability and insulation. In Luxembourg, the three most common options are:

MaterialAdvantagesDisadvantagesIndicative Price (incl. installation)
PVCGood insulator, low maintenance, affordableLess aesthetic, shorter lifespan (20-30 years)400-600 EUR/m²
WoodNatural aesthetic, excellent insulatorRegular maintenance, higher cost600-900 EUR/m²
AluminiumModern design, very resistantLess insulating (requires thermal break)800-1,200 EUR/m²

For optimal energy performance, choose frames with a Uw coefficient below 0.8 W/m²K and triple glazing. To qualify for the Klimabonus, the glass itself must reach Ug ≤ 0.6 W/m²K, and the law asks for windows to be replaced, in principle, together with wall insulation or mechanical ventilation.

Illustrative Case: A Typical Project in Luxembourg

Take the example of a 120 m² single-family home with 10 windows to replace, totaling about 20 m² of windows (outer dimensions). The total project cost is estimated at 12,000 EUR excluding VAT (including installation). Thanks to Klimabonus, you receive 70 EUR/m², i.e., 1,400 EUR in grants. Applying the reduced 3% VAT instead of 17% saves you about 1,680 EUR more. Your net cost is therefore about 10,960 EUR including VAT (12,360 EUR minus the 1,400 EUR grant), instead of 14,040 EUR at the standard rate without the grant, a saving of about 22%.

This case shows that ordering in August and taking advantage of aids allows substantial savings while improving your comfort before winter.

Mistakes to Avoid When Ordering

  • Waiting until the last minute: Manufacturing times are longer in autumn; you risk waiting until the following spring.
  • Ignoring available aids: Many homeowners don't know about Klimabonus and miss out on hundreds of euros.
  • Not comparing quotes: Take time to request at least 3 quotes from certified companies.

By ordering now, you give yourself every chance to carry out your project smoothly, without stress, and with optimal financing.

Conclusion: Act Now

August is the ideal time to order your window frames in Luxembourg. Not only do you guarantee installation before winter, but you also benefit from reduced lead times, better prices, and financial aids like the Klimabonus Wunnen. Don't let this opportunity pass: contact a certified carpenter today and start your energy renovation project.

Frequently asked questions

In the low season (like August), the delay is 4-6 weeks. In the high season (September to November), it can reach 8-12 weeks. Ordering in August ensures installation before winter.

The Klimabonus Wunnen program offers 70 EUR per m² of window (outer dimensions, 80 EUR with the transitional increase), provided the glass reaches Ug ≤ 0.6 W/m²K. Additionally, VAT is reduced to 3% for renovation work in a main residence built at least 10 years before the work starts.

Yes, Klimabonus allows combining several measures, such as roof insulation (a rate per square metre insulated, from 35 to 115 EUR/m² depending on the insulant and the performance standard reached (up to 140 EUR with the transitional increase)) or photovoltaic panels (up to 10,000 EUR, a flat amount from 15 kWp).

It is recommended to choose triple glazing with a Uw coefficient below 0.8 W/m²K to maximize thermal insulation. For the Klimabonus, the requirement is on the glass: Ug ≤ 0.6 W/m²K, with a single rate of 70 EUR per m² of window (80 EUR with the transitional increase).

You must submit your application before starting work, via the Klima-Agence website (klima-agence.lu) or guichet.public.lu. You need to provide a quote from a certified company and invoices after completion.

⚠️ Disclaimer : Prices are indicative estimates (±25-35%). Only a professional quote is binding. Legal notices.

Data verified in April 2026

Ready to get started?

Compare free quotes from verified professionals.

Get a free quote

Recevez vos devis gratuits

Comparez des devis de professionnels près de chez vous

Étape 1 sur 3
1
Vos coordonnées
2
Votre projet
3
Envoi

En soumettant ce formulaire, vos informations sont transmises à notre partenaire Alrootel qui vous met en contact avec des professionnels qualifiés. Ce service est gratuit — nous percevons une commission d'affiliation. Politique de confidentialité

Demande envoyée !

Vous recevrez des devis de professionnels près de chez vous.